Your Cart is currently empty.


en l fa
quality control PDF Print E-mail

Saj has a quality control unit that is responsible for quality control and verification of eligibility by the Bureau of Standards and Industrial Research and guidelines for monitoring and measurement of product, as well as a description of a job at the station a) control of materials and items b) control during production b) control of the final product as follows:

Control of incoming materials and items:

In order to control incoming materials and items we shall comply with the following:
1. Inform quality control on entry of goods into the warehouse with a leaf reached by Storage
2. Inspection of the quality control of incoming goods with quality plans with priority registration results with unmatched parts and recording of 5 items in filing dimensional control results.
3. If the input of raw materials or goods needs to be analyzed as examples of quality control involves accredited laboratories outside the company. The sampling quality plans are offered for each product. So checking incoming materials and items may include material analysis, experiments on properties of the mechanical and dimensional measurements.
4. After receiving analysis tests, mechanical inspector with the standard and quality control results are adapting with the application. If approved, leaves the goods receipt) warehouse receipt (signed by the inspector, quality control and goods Let achieves storage.
When the contraction of minor non-compliance with reporting and analysis has to be seen in relation to quality issues quality control for permission to use the material in the production process issued.
5. After crossing the canal, controlled substances and items imported goods warehousing raw materials required to install the track form will be imported on consignment.
6. The special conditions may damage the materials and items for approval before production release of emergency, the inspector C by inserting “emergency release” forms creates the opportunity to track this event compliance with specified requirements, it is possible to call and immediate replacement.

Control of production:

This directive aims to detect non-compliance with any of the stages of production to ensure product quality. In order to achieve this, the following steps shall be considered:
1.To start production early parts inspected by quality control inspectors placed. This control is based on quality plans for each product. And the results are recorded on the appropriate forms. If there is no conflict continues production and if there is a conflict, identification and reporting of nonconforming product QC issued by the inspector. In order to determine the state of nonconforming product, the QC control of nonconforming product shall proceed in accordance with the procedure.
In each of the steps you need to take corrective or preventive action is in accordance with the procedure corrective action or preventive action procedure is performed. The nonconforming product and corrective or preventive action are carried out to eliminate the causes of non-compliance of license issued by the quality control section.
2. To examine and inspection according to the definitions in the Method and technology sheet by the operator based on the quality plans at intervals defined by quality control inspectors and record the results in the relevant forms. If the non-compliance observed, production stops and procedures such as removal of non-compliance shall be repeated.
3. Continuation of manufacturing operations by the staff of production and inspection plans for the control operation.
4. Defective items in the production process are transported and controlled in a red box for defective items. Quality is required to separate the defective items fortnightly action.
Online parts store waste must be transported and modified parts are modified.
5. In the production, the transfer of semi-manufactured product to the warehouse is done after confirmation of quality control to storage devices. This is confirmed by the seal and signature of quality control in the form of goods receipt) warehouse receipt.

Control of the final product:

The purpose of this section of the guidelines is to ensure that all inspections and tests specified in the product ready are cleared. To this end, the following steps will be taken to achieve this goal:
1. After confirming the quality of the product would acquire the license entry. After packing operation in stock the final product, quality control to check the packaging of the product ready. Controlled factors in quality plans are defined.
2. In case of non-compliance by the operator to identify or detect non-compliance with packaging and quality control inspector control of nonconforming product is operated in accordance with the procedure.
3. After the packaging, the product is ready. One hundred percent of the product is packaged operator the appearance and layout properly, in accordance with the procedure control.
4. Packing operation and control by the operator is carried out according to the method of hundred percent packaging.


TEST REPORT:

When sending prototypes to customer segments, the customers specifically request according to qualitative ones. The report of the analysis of raw materials, metallurgical and mechanical properties is issued according to the dimensions and other specifications. Test report is prepared by responsible for quality control.


بررسي انطباق محصول:

Annually on 14 samples of different products with high product proliferation are sampled according to conformity assessment form in Form No. F-079 and its attachments, sampling and data collection conformity is done with the completion of the study, the percentage of compliance.

Comments
Add New Search
Write comment
Name:
Email:
 
Website:
Title:
UBBCode:
[b] [i] [u] [url] [quote] [code] [img] 
 
 
:angry::0:confused::cheer:B):evil::silly::dry::lol::kiss::D:pinch:
:(:shock::X:side::):P:unsure::woohoo::huh::whistle:;):s
:!::?::idea::arrow:
 
Please input the anti-spam code that you can read in the image.
 

Products Filter

Contact us

Address: No. 36, Kaveh Industrial Complex,Next Aydin chocolate, Before Tractor, Tabriz

Factory tell :(041) 34249511

Office tel :(021) 33113940

Factory fax :(041) 34249512

Office fax : (021) 33907977

Email: info@saj-co.ir

 

Latest News

The new version of the Website of Saj industrial group -

Saj industrial group with more than 04 year activity in the automotive starter and alternator parts, has offered new version Www.saj-co.ir published on its website under the URL.
Web isupgraded to the new version and will be accompanied with extensive facilities. The new version is user friendly web site that has definitely pleasant experience to work with the new version website.
Spread through the new website, the quality and level of access to information, products and services have been increased and customers of the company will be able to post their own needs with more speed and less effort.
We invite you to learn more about Saj Industrial Group and its products and services, from other parts of the Web. Please visit the site.



[Opening of New Office] -
Company [Your Company Name], [your company], a new office today in the [new office] to [the opening of new office] opened. The new office, which includes [the new office facility] is, in fact, [the number of new office] offices in the area. Company [Your Company Name] in [city or state service subject to the new office], [New Services] will offer.
[Sex and the spokesperson for your company name], [the company's spokesman] said, the company opened a new office in [name of your company in the [new office] another important step towards the realization of [the company] is. Opening a new office in the first major change in [the opening of the new office is. [Next quoted a spokesman for your company with market conditions and how to counteract them company.
The new office is expected to increase sales of [the new office will enhance the sale of the service] in [time period to reach a new office productivity] is. The Office of the First [the opening of new office] will lead to.
[Terms of your company] recently obtained Hello [latest change to specify the activity of the company] has. Company [Your Company Name] in [terms of your company] of [your experience] has been recently [Recent developments in your company] has achieved. The company services such as [Company 1] and [Company 2] is known.


[In Exhibition] -
[Several] Fair [title of show] on [date] to [date], from the time [h] to [h] is held. The exhibition at [place] will be open to more than [number of participants in the exhibition] companies in industries [industry name] is.
Company [Your Company Name], this time one of the best opportunities for close relationships with their customers as and hence as one of the psychiatric industry [industry name] the booth [Booth place] will attend.
[Your Company Name] also presented an exhibition of their products with different price for a limited time, get ready to direct your comments and suggestions on the products.
You are invited to attend the exhibition booth of [your company name] please visit.


The technical specifications of the new alternator armature -

Saj industrial group based on customer feedback and to improve product quality dynamo armature after the necessary investigations and replace the relevant formats, new sample with new technical specifications produced.
Saj industry was introduced as an example of the quality in the province in 2012 by the standard of Industrial Research of Iran.




news scroller